Ports of Call - Kieta  
         

Kieta, Bougainville was once the pearl of PNG until 1988 when seccessionist war broke out. The local economy is still largely in tatters and a lot of the infrastructure destroyed during the fighting and is in the process of reconstruction.

Kieta port is still in excellent shape with major exports being copra establishing again.

Wharf-Specifications
 
  Length Width Depth
Berth 1 122m 10.9m 7.5m
Berth 2 58m 8.2m 4.8m
Berth 3 58m 8.2m 4.8m
Barge Ramp Width 2m Grade 1 in 8
 
   
         
   
Kieta Agency
 
Nikana Stevedores Limited
P.O. Box 51, Buka
Ph: +675 986 8038
Fx: +675 986 8038